For installers

This section is for technicians who install, pair, and maintain NovaVMS hardware on site. It assumes you know PoE, ONVIF, Cat6, T568B, and basic network subnetting. If you are setting up your org from the office, start with Set up your first site.

Pages are grouped by the order of a real install: you plan, you stage gear, you mount, you cable, you pair, you hand off. Troubleshooting pages live under /troubleshooting/ and are linked from each install guide.

Start with this flow

  1. Read network requirements
  2. Complete the pre-install site survey
  3. Install a gateway
  4. Install wall and ceiling cameras
  5. Pair your first gateway end-to-end
  6. Add a camera to an existing site
  7. Apply firmware updates
  8. Swap a failed camera